Free shipping over $49 with code FREESHIP
Embroidered to order
My Boat Is Named Change Order Hat

My Boat Is Named Change Order Hat

$35.00 USD $29.99 USD Sale
Hat color: Khaki
Thread color: Royal
Design text: MY BOAT IS NAMED CHANGE ORDER
Typeface: Open Sans Bold
Text layout: Straight
Free shipping over $49
Made to order
Ships in 2–5 business days
Product Details
  • 100% chino cotton twill
  • Unstructured, 6-panel, low-profile
  • 6 embroidered eyelets
  • 3 ⅛" (7.6 cm) crown
  • Adjustable strap with antique buckle
Shipping & Returns

Every hat is embroidered to order and ships in 2–5 business days. US shipping is $4.90 — free on orders over $49 with code FREESHIP.

Questions about an order? See our refund policy or email info@nichemerch.co.

Size & Fit

One size fits most. Unstructured, low-profile 6-panel dad hat with a 3 ⅛" (7.6 cm) crown and an adjustable strap with antique buckle.

What do you think of this design?

Customize your own hat

Remix this design with HatGPT

FAQ

Is this legit? +
What kind of designs can HatGPT make? +
How do I make edits to the design? +
How long does shipping take? +