My Boat Is Named Change Order Hat
$35.00 USD
$29.99 USD
Sale
Hat color:
Navy
Thread color:
White
Design text:
MY BOAT IS NAMED
CHANGE ORDER
Typeface:
Open Sans Bold
Text layout:
Straight
Free shipping over $49
Made to order
Ships in 2–5 business days
The boat-name joke is an old forum favorite: the small boat is the original contract, the big boat is the change order. Custom embroidered in white thread on a navy dad hat.
High-quality embroidered dad hat.
Product Details
- 100% chino cotton twill
- Unstructured, 6-panel, low-profile
- 6 embroidered eyelets
- 3 ⅛" (7.6 cm) crown
- Adjustable strap with antique buckle
Shipping & Returns
Every hat is embroidered to order and ships in 2–5 business days. US shipping is $4.90 — free on orders over $49 with code FREESHIP.
Questions about an order? See our refund policy or email info@nichemerch.co.
Size & Fit
One size fits most. Unstructured, low-profile 6-panel dad hat with a 3 ⅛" (7.6 cm) crown and an adjustable strap with antique buckle.
What do you think of this design?
Customize your own hat
Remix this design with HatGPT
FAQ
Is this legit?
+
What kind of designs can HatGPT make?
+
How do I make edits to the design?
+
How long does shipping take?
+